Waterproofing and structural repair contractor, Mumbai +91 84528 11175 operations@mabani.in WhatsApp

Flooring & Protective Coatings

Epoxy Flooring Contractor for Industrial and Commercial Floors

Industrial and commercial floors take forklift traffic, spills, cleaning chemicals and constant wear. Bare concrete dusts, stains and is hard to clean. An epoxy floor gives a seamless, durable and easy-to-clean surface, but only if the concrete beneath is properly prepared and dry enough to bond.

We install epoxy flooring for warehouses, factories, pharmaceutical and food facilities, parking decks, hospitals and commercial spaces.

Epoxy flooring contractor: finished glossy epoxy floor in a large warehouse
Completed epoxy floor in a warehouse.

What is epoxy flooring?

Epoxy flooring is a resin floor system applied over a concrete base. Depending on use, it can be a thin coating (a few hundred microns), a self-levelling system (typically 2 to 3 mm), or a heavy-duty epoxy screed (4 mm and above) for impact and heavy loads. Polyurethane or PU-concrete systems are used where thermal shock or wet processing is involved.

Every system follows the same core steps: mechanical surface preparation by grinding or shot blasting, crack and joint treatment, moisture checks, primer, base and top coats, and anti-skid aggregates where slip resistance matters.

Benefits

  • Seamless, dust-free and easy-to-clean surface
  • Resistance to traffic, abrasion and many chemicals
  • Options for anti-skid, anti-static and hygienic finishes
  • Line marking and colour coding for safety

Common problems and applications

Problems it solves

  • Dusting, cracked or pitted concrete floors
  • Oil and chemical stains on bare concrete
  • Slippery floors in wet processing areas
  • Old coatings peeling or blistering
  • Uneven floors that trap dirt and water

Where it is used

  • Warehouses and logistics centres
  • Manufacturing and engineering units
  • Pharmaceutical, food and clean areas
  • Basement parking and ramps
  • Hospitals, laboratories and commercial kitchens

Our epoxy flooring process

  1. Floor assessment

    We check concrete strength, flatness, cracks, joints and existing coatings, and test moisture content.

  2. Surface preparation

    The floor is ground or shot blasted to open the surface and remove laitance and old coatings.

  3. Repairs

    Cracks and joints are treated, and holes and damaged areas are filled with epoxy mortar.

  4. Primer

    A penetrating epoxy primer is applied to seal the concrete and bond the system.

  5. Body coat and top coat

    Self-levelling, screed or coating layers are applied to the specified thickness, with anti-skid aggregate where required.

  6. Curing and handover

    The floor is cured before foot traffic and before heavy traffic, as per the system data sheet, then handed over with care instructions.

Materials and systems used

Self-levelling epoxy
Smooth, seamless finish for general industrial and commercial floors.
Epoxy screeds
Thick, trowelled systems for heavy traffic and impact.
PU and PU-concrete systems
For thermal shock, wet processing and food areas.
Anti-static epoxy
For electronics and sensitive areas.
Anti-skid aggregates
Broadcast into the coat for slip resistance.
Typical epoxy flooring build-up: Epoxy top coat, Self-levelling epoxy body coat, Epoxy primer, Ground concrete floorTypical epoxy flooring build-upEpoxy top coatSelf-levelling epoxy body coatEpoxy primerGround concrete floorIllustrative section, not to scale. Actual build-up follows the approved specification.

Products are selected from the approved specification. Coverage, thickness and curing follow the manufacturer's current data sheet.

Why professional floor preparation is important

Most epoxy floor failures are bonding failures caused by poor preparation or moisture in the concrete. Painting epoxy on an unground or damp floor looks good for a few weeks before it peels.

A professional contractor tests moisture, prepares the floor mechanically, treats cracks and joints, and applies the system at the right thickness for the traffic.

Why choose us

Preparation-led
Grinding or shot blasting on every job, not just cleaning.
Moisture testing
We check the slab before committing to a system.
System matched to use
Coating, self-levelling or screed chosen for traffic and chemicals.
Phased installation
Work planned around operations in working facilities.

Read more about our team and how we inspect and record work.

Frequently asked questions

How long does an epoxy floor take to cure?

Most systems allow foot traffic after about a day and full traffic after several days, depending on product and temperature. We follow the data sheet for the chosen system.

Can epoxy be applied over old tiles?

Sometimes, if the tiles are sound and well bonded and the surface is properly prepared. Often removing tiles and preparing the concrete gives a more reliable result.

Is epoxy flooring slippery?

Smooth epoxy can be slippery when wet. Anti-skid aggregates can be added for wet areas, ramps and processing zones.

Do you also coat STP tanks with epoxy?

Yes, using chemical-resistant linings. See STP tank waterproofing.

Service area: Mumbai, Thane, Navi Mumbai, Mira-Bhayandar. Page last updated .

Get an epoxy flooring proposal

Tell us the area, the use (traffic, chemicals, hygiene) and the condition of the existing floor. We will recommend a system and thickness.

All contact details

Prefer to talk? Call +91 84528 11175 or WhatsApp photos of the problem.