Method statements by service
These summaries show how we organise each procedure. Every project receives its own method statement for approval.
How each service is prepared, applied, inspected and recorded.
These summaries show how we organise each procedure. Every project receives its own method statement for approval.
Please note. Coverage rates, thicknesses, curing times, temperatures, mixing ratios and test durations are not given here. They depend on the product and the project, and must be taken as per the current manufacturer's data sheet and the approved project specification.
To waterproof below-ground structures with a sealed HDPE membrane system.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To waterproof slabs and substructure surfaces with an SBS modified bituminous membrane.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To stop or reduce water movement through cracks, joints and voids by injecting PU resin.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To waterproof underground water tanks internally, externally or both, as specified.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To waterproof lift pits and treat groundwater ingress.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To waterproof new bathrooms and wet areas beneath tiles.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To waterproof movement and construction joints using the Sikadur-Combiflex system where specified.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To waterproof reinforced concrete swimming pools beneath the specified finish.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To waterproof exposed, landscaped and traffic-bearing slabs.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To repair deteriorated concrete and restore a protected surface.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To strengthen columns and beams using CFRP, to the design approved by the structural engineer.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To install epoxy floor systems on prepared concrete.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
To waterproof and line STP tanks and water-retaining structures.
Quantities, thicknesses, mixing ratios, curing times and test durations follow the current product data sheet and approved project specification. Project-specific method statements and inspection checklists are issued for approval before work starts.
Inspection first, then a written method and quotation.