WhatsApp +91 84528 11175Call +91 84528 11175operations@mabani.in
  1. Home
  2. Waterproofing Services
  3. New Construction Waterproofing

New Construction Waterproofing Contractor in Mumbai

Waterproofing planned with the construction programme, from raft to terrace.

Waterproofing planned with the construction programme

Mabani Infra is a new construction waterproofing contractor in Mumbai for residential towers, commercial buildings, institutions and infrastructure projects. We waterproof each element at the stage of construction where it can be done properly, from the raft to the terrace.

On a new building, most waterproofing is buried, tiled over or built against soon after it is installed. If it is missed, rushed or damaged by the next trade, the repair later costs far more than doing it right the first time. That is why we plan the waterproofing against the construction sequence, agree the method statements before work starts, and inspect each stage before it is covered.

Waterproofing by construction stage

StageElementTypical approachService
Excavation and raftRaft, PCC and retaining wallsHDPE or SBS membrane with protection layerBasement waterproofing
SubstructureUnderground water tanks and lift pitsJoint treatment, coatings or membranes, flood testUnderground tank waterproofing
SubstructureSTP and water-retaining structuresLining selected for wastewater exposureSTP tank waterproofing
Throughout the frameConstruction and movement jointsSikadur-Combiflex or specified joint systemExpansion joint waterproofing
Podium slabPodiums, landscaped and traffic decksMembrane, drainage and protection build-upPodium waterproofing
SuperstructureBathrooms, toilets, balconies, wet areasUnder-tile waterproofing with junction detailingBathroom waterproofing
AmenitiesSwimming poolsSystem matched to the pool finishSwimming pool waterproofing
RoofTerraces and roof decksExposed or tiled terrace systemTerrace waterproofing

Specification note. Systems, thicknesses and details follow the approved project specification and the manufacturer's current data sheet. The table shows typical approaches, not a design.

How we work with your project team

  1. Review drawings, specification and construction programme.
  2. Prepare method statements and technical submissions for approval.
  3. Agree the sequence and hand-over points with the main contractor.
  4. Install each system at its stage, with stage inspection before it is covered.
  5. Carry out flood or water-tightness tests where specified.
  6. Hand over inspection and test records with the completed work.

We work directly for developers and as a specialist sub-contractor to main civil contractors.

HDPE membrane laid over a raft foundation on a new construction project
HDPE membrane laid over a raft foundation on a new construction project
SBS membrane being torch-applied on a podium slab
SBS membrane being torch-applied on a podium slab

New construction waterproofing: frequently asked questions

When should a waterproofing contractor be appointed on a new project?

Ideally before the raft is cast. Basement membranes, joint details and tank waterproofing all have to be installed at a particular construction stage, and many of them cannot be reached afterwards.

Do you work for developers or for main contractors?

Both. We work directly for developers and owners, and as a specialist waterproofing contractor to main civil contractors, following the approved specification and the project programme.

What documents do you provide?

A method statement and technical submission for each system before work starts, stage-by-stage inspection records during the work, test records where specified, and handover documentation at completion.

Which brands do you use?

We are an authorised applicator of Pidilite (Dr. Fixit), Sika, Sunanda and Fosroc systems. Each element uses the system named in the approved specification.

Tell us about your project

Send the structure, location and scope. For a site visit, include a preferred date. Inquiries go straight to our operations team at operations@mabani.in.

Request a Site Inspection Chat on WhatsApp

Send an inquiry

Up to 3 files, 5 MB each.

Fields marked * are required.

WhatsApp us