New Construction Waterproofing Contractor in Mumbai
Waterproofing planned with the construction programme, from raft to terrace.
Waterproofing planned with the construction programme
Mabani Infra is a new construction waterproofing contractor in Mumbai for residential towers, commercial buildings, institutions and infrastructure projects. We waterproof each element at the stage of construction where it can be done properly, from the raft to the terrace.
On a new building, most waterproofing is buried, tiled over or built against soon after it is installed. If it is missed, rushed or damaged by the next trade, the repair later costs far more than doing it right the first time. That is why we plan the waterproofing against the construction sequence, agree the method statements before work starts, and inspect each stage before it is covered.
Waterproofing by construction stage
| Stage | Element | Typical approach | Service |
|---|---|---|---|
| Excavation and raft | Raft, PCC and retaining walls | HDPE or SBS membrane with protection layer | Basement waterproofing |
| Substructure | Underground water tanks and lift pits | Joint treatment, coatings or membranes, flood test | Underground tank waterproofing |
| Substructure | STP and water-retaining structures | Lining selected for wastewater exposure | STP tank waterproofing |
| Throughout the frame | Construction and movement joints | Sikadur-Combiflex or specified joint system | Expansion joint waterproofing |
| Podium slab | Podiums, landscaped and traffic decks | Membrane, drainage and protection build-up | Podium waterproofing |
| Superstructure | Bathrooms, toilets, balconies, wet areas | Under-tile waterproofing with junction detailing | Bathroom waterproofing |
| Amenities | Swimming pools | System matched to the pool finish | Swimming pool waterproofing |
| Roof | Terraces and roof decks | Exposed or tiled terrace system | Terrace waterproofing |
Specification note. Systems, thicknesses and details follow the approved project specification and the manufacturer's current data sheet. The table shows typical approaches, not a design.
How we work with your project team
- Review drawings, specification and construction programme.
- Prepare method statements and technical submissions for approval.
- Agree the sequence and hand-over points with the main contractor.
- Install each system at its stage, with stage inspection before it is covered.
- Carry out flood or water-tightness tests where specified.
- Hand over inspection and test records with the completed work.
We work directly for developers and as a specialist sub-contractor to main civil contractors.


New construction waterproofing: frequently asked questions
When should a waterproofing contractor be appointed on a new project?
Ideally before the raft is cast. Basement membranes, joint details and tank waterproofing all have to be installed at a particular construction stage, and many of them cannot be reached afterwards.
Do you work for developers or for main contractors?
Both. We work directly for developers and owners, and as a specialist waterproofing contractor to main civil contractors, following the approved specification and the project programme.
What documents do you provide?
A method statement and technical submission for each system before work starts, stage-by-stage inspection records during the work, test records where specified, and handover documentation at completion.
Which brands do you use?
We are an authorised applicator of Pidilite (Dr. Fixit), Sika, Sunanda and Fosroc systems. Each element uses the system named in the approved specification.
Tell us about your project
Send the structure, location and scope. For a site visit, include a preferred date. Inquiries go straight to our operations team at operations@mabani.in.